|
Major Projects
Undertaken |
Designed 3 ROBs for
Surat-Hazira Port section of NH-6 (M/s Soma Enterprises Ltd.)
|
|
Designed nearly 15 rail
road sections and ROBs/RUBs for onside plant roads for the Aluminium Plant of
Vedanta, Jharsuguda (M/s L&T, RBU, Faridabad.) |
|
Designed ROBs on Kota
Bypass (Client : UIT, Kota through CEG, Jaipur) |
|
Designed the ROB for
Rewa-Jabalpur section, NH-7 (NHAI through CEG, Jaipur) |
|
Working on Value
engineering on the Rail/Road alignments for Hazira Port (PMC, Adani
Group) |
|
Design of a minor bridge
for a canal crossing on NH-3 (M/s IVRCL, Hyderabad) |
|
Design of major river
bridges for Nagpur-Betul Project (Client: CEG, Jaipur) |
Up gradation of cable Laying
vessel into Multi support Vessel |
|
The basic design and the subsequent detail engineering for the
up gradation of the vessel was done by PriServe engineering,
which includes the design for the creation of Moonpool,
installation of a well intervention platform with skidding
system and installation of a crane on the main deck. The major
tasks included stability Analysis, motion Analysis, Global and
Local Analysis of the vessel and preparation of structural
drawings for Class approval and the detail engineering for the
fabrication support. We are also positioned to provide onsite
yard support for the same. |
Design of a 3 Column
Semi-Submersible |
|
Priserve engineering has developed a unique
concept of a 3 Column semi-submersible, which will be used as
Floating production and storage unit. We have developed the
design from concept level to basic level design. The main work
involves the preparation of technical specification, General
Arrangement, structural drawings for pontoon, column and deck
box, stability analysis, Motion Analysis, Fatigue Analysis,
Helideck design and analysis, Crane Pedestal design and
analysis, Fairlead Support structures etc. On a turnkey basis,
at PriServe, we are doing the detail engineering of the rig
and would be providing the onsite fabrication support to the
yard too. |
Design of Jack-up Barge for
Offshore and Wind Turbine Installation |
|
PriServe engineering is developing a novel design of a
floating barge to support the installation of offshore wind
energy turbines. It is a jack-up barge, which carries the high
capacity (5 MW) wind turbines and installs the turbines
through self propelled skidding rail system on the offshore
jacket.
On a turnkey basis PriServe has to do the detail engineering
as well as to provide fabrication support too to the yard.
With the successful design of the offshore wind turbine
installation barge, PriServe is to harness the huge
potentiality of offshore wind energy. As an offshore
engineering company, we are trying to rope in the turbine
companies to begin the era of offshore wind energy
particularly in India. |
Design of a unique Fake
Leg |
|
PriServe engineering is working on a unique concept of a fake
leg, which would work as temporary support for the jack-up
Rig. This will be used for the repair of the spudcan and saves
the dry-docking charges of the jack-up rigs when it comes to
shipyard for repair work. |
Load Out of a Jack-Up and
Design of a Submersible Barge |
|
PriServe Engineering is working on the Design and Engineering for the load out of a
JU-V-351. The submersible barge going to be used for this purpose would also be
designed by PriServe.
|
|